Snow-white natural gypsum according to DIN 1168, for mounting sockets, cables, plaster profiles, for modelling, casting and handicrafts, set after 15 minutes, can be sanded, drilled, sawed and painted over after hardening, for indoor use, processing temperature: 5-30 °C, waiting time for subsequent work: leveled surfaces can be painted over, plastered over and wallpapered after 2 hours, dowels can be loaded after 1 hour